Safety Measures for Harbin Steel Structure Construction in Rainy Season
Release time:
Aug 26,2024
Steel structure rainy season construction "safety" is the most important, the following briefly introduces the Harbin steel structure rainy season construction safety measures:

steel structure rainy season construction "safety" is the most important, the following briefly introducesHarbin Steel Structurerainy season construction safety measures:
The leakage protection installation of all kinds of electrical appliances must be sensitive, and all kinds of construction lines must be checked regularly. The insulation outsourcing must be in good condition and free from damage to prevent people from being injured by rain leakage. Canopy shall be erected on the upper part of the electric welding machine, grinder, threading machine and other equipment set up outside the room, and cushion method shall be adopted on the lower part to prevent rainwater from soaking.
• The power cord shall not be erected with bare wires or plastic wires, and the distribution box must be rainproof. The metal skin of mechanical and electrical equipment must be reliably protected by zero connection, and the leakage protection of the motor switch box must be reliably installed.
• Any mechanical operator must be certified and wear insulated rubber shoes and gloves as required.
Stop all mechanical and electrical operations in case of heavy rain. The power supply of the main electrical box of the on-site steel bar processing yard must be turned off. After the rain, the safety performance of machinery and electrical appliances should be checked in time. Lifting of equipment and components and manual handling of materials or equipment are strictly prohibited in heavy rain.
• Steel structureThe cables and wires used on the construction site are strictly prohibited from soaking in rainwater or laying on wet ground. They should be installed overhead or buried and set up safe and reliable protective measures.
• Strengthen the observation density of the slope during the rain period, including the slope must be observed in time after heavy rain. Minimize material stacking on the foundation pit slope before heavy rain.
• The anti-skid strip of the horse track shall be firmly bound, and the anti-skid strip shall be checked and reinforced regularly to prevent accidental fall and injury of upper and lower personnel.
• Organize manpower to clean the accumulated water on the floor slab, horse road and other places immediately after the rain. Special attention is more slippery scaffolding after the rain, the operator pay special attention to anti-skid, anti-falling.
• For potholes, protective fences or warning signs should be set up to prevent personnel from slipping.
• Rainy period must be regularly checkedSteel structureConstruction site tower crane lightning protection device.
Before the construction in rainy season, the power supply, electric box, grounding and insulation of tower crane on site shall be tested and recorded.
After the rain, all electrical equipment and boxes should be checked once. The doors of each box must be closed and must not be open.
• On-site construction personnel, safety officers, technical personnel on a regular basisSteel structureSafety inspection shall be carried out on the construction site during rainy period, and problems found shall be handled in time.
Brief introduction aboveHarbin Steel StructureConstruction safety measures in rainy season.
For more exciting content, please visit the official website of Heilongjiang Zhongjie Steel Structure Engineering Co., Ltd. www.hljzhongjie.com
WeChat public platform zhongjiesteel
Key words:
Related News
Color Poetry Board Color Selection Essential Artifact-RAL Color Card
Classification and application of steel plate
Zhongjie Rock Wool Color Steel Plate High, Medium and Low Grade Product Gradation Revealed
Safety Measures for Harbin Steel Structure Construction in Rainy Season
Analysis on the Gutter of Heilongjiang Steel Structure Maintenance System
Message consultation
Column navigation
Address: Heping Industrial Community, 243 Xianfeng Road, Daowai District, Harbin City
Tel:86-451-85926866 / 85926766/ 85926966
Steel color plate:86-18646226678
Container House:86-18945077088
International Trade Line:86-451-85926000
Website:http://hljzhongjie.com
Copyright©2024 Heilongjiang Zhongjie Color Coating Plate Co., Ltd. |Business License | SEO Tags |city substation Powered by:www.300.cn